Client : | University of Leeds | Value : | £5m | Location : | Leeds | Time : | 3 Years |
Scope of work
- Enabling and site set up
- HV diversion
- Basement construction including liner walls and full waterproofing
- Under slab and site wide drainage
- Upper floor structural toppings
- Site wide services and incoming to new building
- Hard landscaping works including street furniture
- Decommission and make good following completion
- Laboratory standard clean room with anti-vibration plinths for equipment to sit on
- Deep basement with substantial support beams
- Paving and landscaping the front entrance and concrete benches
- Full Sika Waterproof design installed
- 2 Geo-cellular attenuation tanks installed 112m3 and 15m3
- 2 foul water pumping stations
- Constructing a capping beam averaging 330kg/m3 of reinforcement to the building
- Full diversion of existing HV, Data and Steam mains around the proposed building for the university prior to the main works going ahead
- Structural improvement works to the basement and roof of the existing Old Mining Building to allow additional levels to be installed above
- 450t of reinforcement and 3,400m3 concrete poured.