The redevelopment includes new offices, a restaurant and a café in the new plans for the medieval grade I and II listed buildings. Our involvement included the construction of:
Client : | Vinci Construction | Value : | £1m | Location : | York | Time : | 21 Weeks |
- 600m2 RC slabs
- 4 storey jump form core
- 40m RC retaining walls
- Grade 3 waterproof structure
Works of historic importance in the centre of York working in a sensitive environment alongside archaeologists, managing works around potential floods from the River Ouse, river logistics, lift shaft construction with complex reinforced concrete and waterproofing.
- Working alongside the Canal and River’s trust with all materials being delivered by barge and floating pontoons on the River Ouse
- Working alongside the archaeologist’s to uncover York’s medieval history
- Restricted concrete pour sizes due to access
- Restricted working space and lay down areas