This Regional Distribution Centre comprised of works including the foundations, drainage, services, external concrete service yard circa 50000m2. Plus drainage installation through difficult ground conditions being rock, attenuation tanks, external works and concrete service yards.
Client : | BAM Construction | Value : | £1.7m | Location : | Leeds | Time : | 18 months |
- Structural alterations to the existing playhouse building and theatres/stages including in-situ concrete lift shafts
- Two storey extension to the playhouse frontage
- Extensive hard landscaping
- Archaeological assistance