Commercial

Majestic Building

Installation of new raft foundations and retaining walls to a Grade 3 waterproof standard. Confined space working within one of Leeds most iconic listed buildings.

Client : Sir Robert McAlpines
Value : £2.9m
Location : Leeds
Time : 3 Years

  • Installation of new raft foundations and retaining walls to a grade 3 waterproof standard. Confined space working within one of Leeds most iconic listed buildings
  • 1400m2 waterproof raft slabs
  • 155m shotcrete retaining walls
  • 7 story slip form core
  • New internal drainage
  • Concrete to upper floors
  • All form work Provided by Leeds Acro
  • Restricted access working with confines of an existing building. Plant lowered into basement by hoist
  • 2000m3 material excavated from basement and removed using conveyor systems
  • Raft foundation works including core base construction
  • Slipform Core