2 Level Car Park

Location. New Waitrose Store. Oadby Leicester.
Customer. Abbey Civil Engineering Ltd.
Full range of our equipment used. Ecoas Panels for the Lift Shafts. Mammoth Panels to Basement Walls Kwikstage Shoring with Soldier Primary & Aluminium secondary beams to support Main Central Spine Beam. Kwikstage Shoring with Primary & Secondary A-Beam to insitu slabs. Bira Radius Formwork to Car Park Ramp walls.


Insitu Concrete Floor Slab

Location. YMCA Building. Stoke-on-Trent
Customer. Andy Jadzcak
Equipment. Kwikstage Shoring with Primary & Secondary A-Beam. Mammoth Panels to basement walls & lift shaft. Bira radius formwork to car park ramp walls.


New University Science Lab. Building.

Location. University of Sheffield
Customer. B & S Groundworks Ltd
Equipment. Mammoth Panels to 5.3mtr high Battered walls. Ecoas Panels to Lift Shaft between floors. Ecoas to Entrance road walls.


New Academy School Build

Location. Leeds West Academy. Intake Lane.
Customer. Moortown Construction.
Equipment. Mammoth Panels to 6.25mtr Retaining Walls. Mammoth Panels to Shear Walls & Lift Shafts Carofalt Shutters to Columns. Edge Protection Barriers to Floor Slab levels. 2no 14.5mtr Stair Towers


New House Build.

Location. Luddendenfoot, Halifax.
Customer. Benchmark Ltd
Equipment. Mammoth Panels to 3mtr high Basement retaining wall. Set in hillside.


Waste recycling centres & Waste Transfer stations

Locations. Boysnope Wharf Recycling centre. Irlam.
Household Waste recycling centre, Altrincham.
St.Helens Waste Transfer Station.
Trafford Park IVC Building, Manchester.

Equipment. 3.5mtr high Mammoth panels to HWRC walls turned on their sides for 2.5mtr high x 1.65mtr thick platform bay walls. Mammoth Panels to 4.3mtr high waste station walls. St. Helens had 4no, 49mtr long pours. Trafford Park had 15no, 17mtr long pours.

Leeds Acro Case Study - Waste recycling centres & Waste Transfer stations
Other Projects recently completed.
Pumping Station Tanks

Mammoth Panels to tank walls
Locations. Eithinfynydd WTW, Tal-y-Bont. West Wales. Bawtry, Doncaster.

Swimming pool walls.

Ecoas Panels to pool walls & balancing tanks.
Locations. Morley Leisure Centre, Leeds.
Private House Pool, Didsbury, Manchester.
Hydrotherapy Pool, Sirius & Ganton Academy, Hull.


Grain Store Walls.

Mammoth Panels to Grain store walls / Farm Buildings.
Locations. 5mtr high Grain store walls Micklow House Farm, Stone, Staffordshire.
3.5mtr Grain Store walls. Haddocks Farm, Nr. Boroughbridge.
Both using our 3.5mtr x 2.5mtr Panel in vertical or horizontal positions.

Chemical Bund Walls

Ecoas Panels to Bund Walls from 500mm high to 1.2mtr
Locations. 1.2mtr Bund. Novartis, Speke, Liverpool.
1.2mtr Bunds Tetrosyl, Bury.
0.5mtr bunds. Astonish, Bradford.
1.0mtr Bund. Lubrizol, Huddersfield.
1.2mtr Bund. Rhodia, Holywell Green, Halifax.
0.9mtr Bund Altmouth, Formby.